MV Switchgear

Maintenance, testing and commissioning of medium-voltage (MV) switchgear, with a test programme agreed for the equipment and the purpose of the work.

Engineer performing relay testing on medium-voltage switchgear with a test set
Illustrative image.

Typical situations

  • New MV switchgear needs testing and commissioning before energisation.
  • Existing switchgear is due for planned maintenance.
  • Protection relays need testing after installation, replacement or setting changes.
  • Interlocks or trip circuits are not operating as expected.

What we do

  • Planned maintenance and circuit-breaker service.
  • Protection-relay testing by secondary injection.
  • Circuit-breaker timing and contact-resistance measurement.
  • Interlock, trip-circuit and functional checks.
  • Commissioning support for new or modified switchgear.

Confirmed after survey or agreed separately

  • Secondary injection verifies relay response to injected signals; it does not replace primary injection, insulation or other tests where they are required.
  • The test list and acceptance criteria are agreed per equipment, with reference to manufacturer guidance.
  • Switching operations and permits to work remain under the control of the site's authorised persons.
  • A protection coordination study — fault levels, settings calculation and grading — is a separate scope and is confirmed when needed.

Engineering interfaces

  • Transformers and LV distribution
  • Utility incomers and metering
  • Protection relays, CTs and VTs
  • Generator and transfer control schemes

Typical deliverables, as agreed

  • Test records with results against agreed criteria
  • Record of relay settings as tested
  • Findings and recommendations

Frequently asked questions

Do you calculate protection settings?

Relay testing verifies that the applied settings operate as intended. Calculating settings and grading requires a protection coordination study, which is quoted separately when needed.

What should we send for a quotation?

Switchgear manufacturer and type, number of panels, relay models, the reason for the work (new installation, maintenance or fault) and any outage windows.